text.skipToContent text.skipToNavigation
 

Component shortage strengthens itsme’s connection with Rensen


Climate control is in hot demand, as they experience every day at Rensen, specialist in measurement and control technology for building automation. Despite continued price increases, sales and execution are under pressure. The component shortage that emerged last year only increases the challenge of completing projects on time. itsme supports this by monitoring delivery times from the start of a project, finding alternatives if necessary and optimising inventory management. “I’m here almost every week now.”
 

Rensen (75 employees), headquartered in Uden and branch offices in Kerkrade and Lelystad, builds climate control systems for offices, schools, hospitals, etc. As a specialist in measurement and control technology – “the largest independent control company in the Netherlands” – Rensen provides control cabinets for climate installations to end users and installers. The climate computer comes from Priva or Siemens, while Rensen has been going to itsme for all other materials and components for many years. 
 

Inventory management

The relationship with itsme has always been strong, explains Ruud Cuppé, commercial director and co-owner of Rensen. “Ultimately, people do business with people; things always go well with Gé (Driessen, sales representative at itsme, ed.), and he often sits down with us to address issues with delivery.” Here Cuppé is referring to the worldwide component shortages that has kept industry in its grip since last year. For his company, that means every single project is a bit of a puzzle, because it continues to be busy despite the ongoing price increases. “I expected that this would make it calmer in sales and that construction projects would not go ahead, but it’s strange how the requests just keep coming in. And that doesn’t even have anything to do with the energy transition. New installations are built without a boiler, but for existing installations there are few projects for conversion to a heat pump. We mainly see that there is increasing attention towards a pleasant climate for work spaces.” Driessen: “We had also expected a change in requests and order intake due to these price increases, but to date we haven’t yet seen it.”

“If necessary, we will switch to another manufacturer; we have moved away from sticking to certain brands”

With regard to the component shortage, Driessen hopes that the problems will be resolved by the middle of next year. Until that time, Rensen and itsme will continue to work together intensively, says Cuppé. “If a component is not in stock, Gé will look for an alternative. If necessary, we will switch to another manufacturer; we have moved away from sticking to certain brands. If necessary, we will also consider a completely different solution, which might require a different structure for the cabinet, for example. That’s where Gé comes up with ideas.” Modestly, Driessen adds, “at itsme, I have a team of people who support me.”
 

Proactive

Rensen and itsme have also adjusted the inventory management, expanding the two-bin system. This is mainly used for the so-called grab stock of components with low purchase value, such as clamps, union nuts, wire trays and wire. Cuppé: “Previously, a 23 cent clamp would be in the warehouse and the warehouse employee would have to hand it out it, but now the mechanic can immediately take it to the workplace. That saves an enormous amount of time and costs.” While one bin is in use, the other bin is restocked. Driessen: “We scan and replenish the stock every week, so that Rensen always has sufficient stock for its production. We evaluate that at least once a year, and more often during this time. If stocks are running short, this will often also be signalled by the people on the work floor. Then we make adjustments in the stock levels in the meantime.”

“Customers, get those plans in so that we can order the materials”

itsme has furthermore proactively addressed bottlenecks, continues Driessen. “For example, supplier Hager reported increasing delivery times for wiring gutters early on. We supply them in different sizes. Together with Hager, we have identified Rensen’s needs and we have expanded their vendor managed inventory for the quick-sellers. Thanks to Hager’s proactive set-up, we were able to build up an additional safety stock at Rensen. I do this type of inventory for multiple products to maintain the desired turnaround times where possible. If necessary, we will buy from somewhere else where there is still stock.”

However, itsme is sometimes not able to escape delays in delivery to Rensen, Driessen admits. “Occasionally, we have to shuffle the schedule about in consultation with their project managers, because items simply cannot be arranged on time.” However, thanks to the intensive cooperation, Rensen is not having any difficulty due to late delivery, Cuppé reports. “In construction, other parties are having greater problems with the supply of materials than we are. itsme can stay ahead of these problems because it delivers faster than other companies.” 
 

Intensive contact nearly every week

It does require a lot of effort and coordination, sighs Driessen. “Both for Rensen and for us, keeping an overview takes a lot of energy. We were used to everything just being on the shelf or coming in within less than a week; now everything has to be monitored.” Cuppé: “That’s why we tell our customers to pre-order whatever they can. This is of course not possible for components that first require drawing work, but in that case we tell them, ‘just get your plans in so that we can order the materials’.”

As long as the focus is on component shortages and long delivery times, ambitions for further streamlining supply have been put on the back burner, Cuppé reports. “A few years ago, we had jointly developed a plan to have itsme deliver complete kits for each project. That would save a lot of time, because our technicians would no longer have to put together the parts for a project in the warehouse.” Driessen: “In this time of shortages, that would only slow down work and cause problems. Rensen now has a buffer with the two-bin system and extra safety stock, which allows things to go much faster.” All of this is now demanding the undivided attention of both parties. Despite corona, the contact last year only intensified, says Driessen. “Our collaboration is becoming more and more broad. I now have contact with lots more people at Rensen. Their engineers and project managers are getting better and better at knowing how to reach me for the challenges with deliveries. I’m here almost every week now.”

 

Stay up to date with the latest news:

  • NEWS
    02.05.2024
    Fluke - 1736 three-phase Power Logger
    Today, we are increasingly faced with the need to optimise energy flows, find energy-efficient solutions for large consumers and bring down overall energy consumption. Saving on electrical consumption is therefore one of the topics high on companies' agendas. One of the first tasks in this process is to identify large consumers and try to minimise extra losses due to harmonics, imbalance, ... try to minimise them. For this, the Fluke-1736 is an ideal combination that allows not only to map electrical power flow, but also problems with harmonics, imbalance, mapping. This is therefore usually the first step to start improvement processes.
    Read more
  • NEWS
    01.05.2024
    Sylvania – Kalani
    Kalani has quickly become a much sought-after and appreciated range of floodlights since its launch. Sylvania is always striving to optimise its product ranges in terms of specification, energy efficiency, performance and price. For example, it recently introduced the new Kalani range, with a new, more rounded design and a more competitive price. The range has an IP66 protection rating and IK08 shock resistance.
    Read more
  • NEWS
    30.04.2024
    Schneider Electric - Harmony relays for various industrial applications
    Delve into the world of the VX plinth plinth system - a successor that takes your cabinet arrangement to the next level. More stability, but also flawless installation. Experience the evolution of your workspace today! Rittal strives to constantly refine and improve its products. As part of this process, the VX plinth plinth system has been redesigned this product has been available since 1 March 2024.
    Read more
  • NEWS
    30.04.2024
    Rittal - AX & KX in stainless steel versions now available
    Since 1 March 2024, Rittal's product range has been extended to offer AX wall/floor enclosures and compact KX enclosures in stainless steel versions. The sheet steel AX enclosure is widely used as a system cabinet for a wide variety of applications. Rittal is now coming out with a variant of this enclosure.
    Read more

Check out our other success stories:

  • TESTIMONIAL
    19.04.2024
    Dymotec - Open Lines in a ‘Perfect Storm’
    COVID-19 and global component scarcity threw the industry into a ‘perfect storm’. Industrial automator Dymotec and Breemes kept the phone lines constantly open to tackle the scarcity problem together with creativity and proactivity. Dymotec in Olen (B) focuses on industrial automation spanning a broad spectrum of industries, from food and pharma to logistics and metal. The company has been around for 30 years and joined the Jeco Energies Group in 2022. Dymotec now has some 50 employees and also has a flexible shell with technicians, programmers and project engineers. Ever since its establishment, the company from Kempen has had a relationship with (the predecessors of) Breemes.
    Read more
  • TESTIMONIAL
    15.02.2024
    Enduro - Complete package for heavy-duty work
    Enduro Softslings builds machines for the manufacture of its own heavy lifting soft slings. For a new machine, it called in itsme for the full package: advice on the drives, supply of components and programming of the controls. “We completed the entire project in just over six months. That’s fast for such a specialised machine.”
    Read more
  • TESTIMONIAL
    13.02.2024
    Stimac - Good technical support for ever-changing specifications
    If the description for an automation project is clear from the start, it is easy for the industrial automation specialist to give it substance. In practice, however, specifications often change during the course of a project. This happened to Stimac/SNK when designing the control technology for a horticultural machine. For the problems that arose during the process, itsme quickly provided Stimac/SNK with a solution. “When a customer calls us, we respond immediately. So it’s nice to have a supplier like itsme who can also help immediately.”
    Read more
  • TESTIMONIAL
    20.12.2023
    Innovatec - Hatching Better Procurement
    Innovatec Hatchery Automation launched a process of professionalisation for its procurement process last year. The company partnered with itsme because of its technical expertise, logistics concepts and intensive contacts with manufacturers. “First we were dating, but now we’re thinking about moving in together.”
    Read more

Why not take a look at these trainings we offer: