text.skipToContent text.skipToNavigation
 

Vicoma - Virtual Reality Actually Delivers Lighting Benefits

A lighting plan may look nice on paper or screen, but ultimately what counts is what the lighting does in reality. Virtual reality can help to get a good idea of this in advance. Consultant Vicoma and lighting expert itsme proved it in a project for the Royal Netherlands Navy. "They knew within 7 minutes: ‘That’s how we want it’."


Vicoma is an independent consultancy and engineering firm with five offices, including one in Velsen-Noord (60 employees). Christian Klaver has been working there for two years now as Electrical & Instrumentation team leader. For a lighting project at the Royal Netherlands Navy in Den Helder, he brought in itsme to design the lighting plan. In doing so, he worked mainly with Ruud Adriaansen, team leader of the Lighting Design Center at itsme.

Curious about Breemes' lighting plans?

Fill in the form and we will get back to you!

Incredibly fast

The project involved new lighting for a dry dock. That is a hall where a ship can enter for maintenance, after which the dock is drained. That way, the part that is normally underwater can be blasted to clean it, and sprayed to repaint it. The old lighting was a sight for sore eyes, says Klaver. "There were old gas discharge lamps, the whole hall looked yellow and orange." Adriaansen adds: "In terms of lighting and shadowing it was an absolute disaster. "If you sailed a ship back out after maintenance and a part turned out not to have been sprayed properly after all, you would have a serious problem with planning and costs if you had to go back into the dock. We therefore had to do everything possible to provide the proper lighting." Of course, energy saving also played a part, Klaver continues. "However, that was more of an added bonus. What the Navy mainly wanted was good lighting so that spraying could be done properly."

"Everybody could pitch in"

An additional requirement was that the lighting should be easy to switch, in order to play with light levels flexibly. For example, spraying requires a different light level than assembly work. The maximum light level was exceptionally high and high uniformity was required, Adriaansen explains. "In terms of lighting requirements, this was an extensive project." What was also special was the way those requirements were put on the table, Klaver explains. "We went to Den Helder together with itsme and immediately invited all the users of the dry dock to start laying down the principles properly. This ranged from the company that sprays ships and the department responsible for bringing them in, to the crane operator and the safety department. Everybody was allowed to pitch in on the lighting requirements." Adriaansen describes the situation as unique. "To have all parties pitch in is something we don't often experience." Fortunately, there were no conflicting preferences, reports Klaver. "We were able to work it out miraculously quickly. People had their say and we wrote it down; there were no disagreements."


Everything in 3D

During the first survey, itsme took light measurements in order to compare the existing and the desired situation, Adriaansen explains. "Based on that, I created a design. One of the challenges was mounting luminaires on the ceiling, due to the height of the hall. Moreover, the assembly had to be done quickly, to avoid the dock being out of operation for too long. I then performed calculations as proof of sufficient lighting levels. This time I went the extra mile by working out the entire hall in 3D and putting in all the models of the luminaires in 3D. This resulted in a virtual reality model that ultimately played a pivotal role in the decisions on the lighting plan. We showed some people from the Navy that lighting plan in virtual reality and in less than seven minutes they agreed: ‘That’s how we want it’ I have never experienced a decision being made that fast."

"We also perform the final check, with the Lighting Acceptance Test"

At a number of points, the lighting was still found to be inadequate, Klaver adds. "The lighting plan was immediately adjusted accordingly." A particular challenge was that the luminaires to light the bottom of a ship would be underwater for as long as the dry dock was not drained. Those luminaires therefore had to withstand salt water, the pressure at 12 metres underwater and the force of incoming water as the dock filled up again. "What luminaire could we possibly install down there?" When it came to choosing the brand, the parties therefore took time to decide, recalls Adriaansen. "In the end, we found a supplier that had everything in its package, Norka. With an entire delegation from the Navy, Vicoma and itsme, we visited their factory in Germany to get an impression of the quality of the luminaires.
"Vicoma was then able to write the specifications that would allow the Navy to take it to the market for competitive bidding. This completes the lighting design, which means the work is almost done for itsme, says Adriaansen. "During the installation, a colleague will still check that everything is installed as we designed it. We also do the final check." This is done with the LAT, the Lighting Acceptance Test, explains Klaver. "Part of the specifications is that an LAT must be carried out, in the presence of the company that made the lighting plan, in other words itsme."
   

Excellent

This LAT is the last phase of a very special project. "For me, it was the first lighting project of this size," says Klaver. Adriaansen calls it "Quite a unique situation". "Usually we are at the table with the end user, this time it was a consultant." Both parties are content about the cooperation. "Excellent," says Klaver. "We are in sync and know each other's strengths: itsme has expertise in making a lighting plan, we in writing specifications." Adriaansen agrees: "We understand each other and are able to complete each other’s sentences, which makes communication fast and transparent, resulting in clear agreements." Klaver: "Because we outsourced relatively much to itsme, we as Vicoma had it relatively easy. We leaned very much on the expertise of Ruud and his colleagues. As a spin-off, we have already made an offer for a full package together with itsme for a subsequent lighting project." Adriaansen: "I've been in the lighting business for 26 years now and my Top 5 most challenging projects definitely include this one. We regularly receive international relations and the first thing our director starts talking about is this example."


Check out our other success stories:

  • TESTIMONIAL
    08.09.2025
    Avebe - A Good Night’s Sleep Thanks to FactoryScan
    Companies often have no clear idea of the installed base of industrial automation in their factories and warehouses. With FactoryScan, itsme can provide an overview of the current status of automation components such as PLCs. Potato processor Royal Avebe uses the results to update their component stock and assess future availability. The scan is intended to reduce the number of hardware-related disruptions Process Control Engineer Johan Wierenga has to deal with. It also helps him sleep better, knowing the stock is up to date.
    Read more
  • TESTIMONIAL
    25.08.2025
    Elektro VV - The right expertise in the right place
    Elektro VV, based in the Belgian province of Antwerp, carries out general electrical work and solar panel installations for both companies and private individuals. For complex projects, the company calls on Breemes, which brings expertise such as low-voltage studies. “The challenge is to design a panel that can be built quickly and efficiently, and is future-proof.”
    Read more
  • TESTIMONIAL
    18.06.2025
    IEC
    To control the expansion of a silo park, engineering & construction company IEC called on Breemes. Being involved in the engineering from the beginning, the electrical service provider was able to make smart proposals for both the low-voltage part and the PLC control. ‘We have always been able to find each other well and when changes occurred, we were quickly on the same page with Breemes.’
    Read more
  • TESTIMONIAL
    02.04.2025
    TR Service - Future-proof low-voltage panel
    TR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
    Read more

Stay up to date with the latest news:

  • NEWS
    02.10.2025
    Siemens - IO-Link: The Power of Real-Time Data Exchange
    In an age where speed, efficiency and reliability are crucial, IO-Link provides the link between machines, sensors and your control systems. Thanks to direct data exchange and simple integration, you can get more out of your processes, reduce costs and lay the foundation for future-proof maintenance.
    Read more
  • NEWS
    08.09.2025
    Siemens - Revolution in Motion Control
    You are at the start of a new working week. While you are putting the finishing touches to an important project, a request comes in: the customer has a malfunction. The machine is down, but the deadline is approaching. You are asked to respond quickly.
    Read more
  • NEWS
    17.07.2025
    Siemens - Cybersecurity - Defense in Depth
    With the concept of ‘Defense in Depth,’ Siemens offers a layered security model that provides comprehensive and in-depth protection for industrial installations. This concept is based on the recommendations of IEC 62443, the world's leading standard for industrial cybersecurity.
    Read more
  • NEWS
    02.06.2025
    Siemens - SIRIUS 3RC7 ILM
    With the SIRIUS 3RC7 Intelligent Link Module (ILM), Siemens now offers a fast and easy way to achieve full data transparency down to the field level by making conventional motor starters intelligent. This plug-and-play extension module combines Information Technology (IT) and Operational Technology (OT) with minimal installation and commissioning effort. This allows the data available from field devices to be efficiently utilized.
    Read more

Why not take a look at these trainings we offer: