text.skipToContent text.skipToNavigation


​​​​​​​Dycore takes lighting to the next level
 

Improved visibility enhances safety and work comfort
 

Precast concrete flooring systems for residential and non-residential construction. At Dycore they know all about it. Adequate lighting in both production and transferring of these floors is essential. Safety comes first, closely followed by the avoidance of damage. Jos de Laat, head of the Technical Department at Dycore Breda, explains that as a specialist they like to focus exclusively on concrete floors, with other affairs being regularly outsourced. “For our lighting, I rely on itsme’s specialism.”

“Here in Breda, we have a team of 45 people working on wide slab floors. These semi-finished products consist of a concrete shell with reinforcement. It’s not until the slabs are in place at the construction site that a concrete end layer is poured onto them”, Jos explains. Note: we are talking concrete floor parts here of 10 x 3 metres and a height of up to 30 centimetres. 

It requires a gigantic 30-ton fork lift to relocate these concrete slabs to the stacking field, where all products are awaiting transport. The slabs are accurately positioned on truck trailers, obviously without hitting anything. Moreover, the stacking field can be quite hectic with heavy transport coming and going and people walking around the vehicles. This makes good visibility essential. During daytime, things worked out fine but when darkness fell, it all became a different story. 

 

A lighting solution for every application
 

Around that same period, itsme installed a number of test fixtures in the Dycore production hall because the lighting there also required renewal. Jan Straetemans, lighting specialist itsme, advised to double the lighting level from 25 to 50 lux, based on a lighting plan. For the technical workshop he even recommended 500 lux, suiting the fine-mechanical work which involves small bearings and screws. It was also Jan who suggested the use of lamps with a colour temperature of 5000 K. “It’s whiter and it’s closer to natural daylight. We tested several wattages and it actually did turn out to be more comfortable to work with”, says Jos. 
 

“For our lighting, I rely on itsme’s specialism”

And so, it didn’t take much to convince Jos when Han Elsen, account manager at itsme, suggested to involve itsme Lighting Technology in the stacking field lighting project. Jos: “The indoor lighting project was running smoothly so I was pretty confident that this would also turn out fine.”

The outdoor area, however, posed an extra challenge. “Supplying the materials is one thing”, Han says. “You’re also facing a complete infrastructure though: the wiring and all the cabinets that need to be installed inside the lighting masts. We don’t have that expertise available ourselves.” For Dycore, however, it would mean a major advantage to keep everything central with one company taking on the entire project.  Jos: “If you are working on a project with several companies, something is always bound to fall between the cracks. I prefer working with a single party.” That is why itsme appealed to their own network, ending up at Hans Eek Infrawerken from Rossum. They had collaborated with this customer before and, more importantly, they were one of the few parties having experience with the exceptionally high masts of 18 metres, where 10 to 12 metres is pretty much the standard.  
 

“It’s like working in daylight”


Dycore asked itsme to provide the entire stacking field with a lighting level of 50 lux, in line with the standard that applies to the kind of work which is being carried out there. Jan designed a lighting plan for that purpose, mapping out all light points in 3D. By moving, adding or removing them, he calculated the effects of certain investments. Colours graphically indicated the minimum and maximum lighting level. They also showed how to achieve an optimal light output at the lowest possible costs. This resulted in 11 new led fixtures with asymmetrical light distribution. 
​​​​​​​
 

Team efforts
 

After Hans Eek Infrawerken had attached the fixtures to the masts, they had to adjust the fixtures. 
Normally, this is done by testing on-site. However, given the fact that Jan was familiar with all lamp specifications and had also calculated the effects in his lighting plan, he was able to provide instant, specific advice. To set the fixtures slightly flatter, for instance, preventing the light from shining in people’s eyes. Or to tilt them at a certain angle, creating an optimal light distribution on the floor. An additional service to Dycore for which he gladly returned. Jan says enthusiastically: “When the fixtures are being installed, there’s actually nothing much I can do. But I find it super interesting to come and see and assist Hans Eek in aligning those fixtures. This way, we as itsme, stay closely involved in the project.”

“Afterwards, I spoke to an employee working on the stacking field”, Han says. “He told me that the situation improved tremendously in terms of safety and work pleasure. You no longer have to be afraid of tripping over something in the dark, you can read all the labels on the floor slabs without secondary lighting.” The new lighting didn’t go entirely unnoticed in the surrounding area either. Jos laughs: “People sometimes joke that we moved the Breda football stadium to the Dycore stacking field. It really is a massive light source, it’s almost like working in daylight.” 


​​​​​​​​​​​​​​





​​​​​​​Long lifecycle with led
 

Dycore is part of Irish company CRH, which is globally represented by 79,000 employees, mainly in the construction industry. Dycore first established itself in Oosterhout, followed by branches in Lelystad and Breda; at each location specific types of concrete floors are manufactured. Their history goes back to 1975. Back in those days, with gas-discharge lamps still being mainstream, light intensity started to decrease after 4 years. For the illumination of the stacking field, Dycore opted for Philips led fixtures. The project concerned 4 new light masts with a height of 18 metres, containing 2 led fixtures of 1314 watts each. 2 existing masts, measuring 18 metres as well, were provided with a total of 3 led fixtures of 1314 watts. All in all, it would involve quite a job to replace all lamps. However, based on 3600 burning hours annually, replacement doesn’t have to be scheduled within the coming 30 to 40 years.

You might also be interested in this:

Pneumatic re-engineering
Our re-engineering of your pneumatic system starts with an inventory. Here, we first look at the compressor. We then also check the pipe network, couplings and hoses needed to control the pneumatic components. If certain components need to be replaced by new versions, this is mentioned in the report.
Read further
Webplatform
The Breemes web platform offers an e-catalog with over 2 million products for industry and mechanical engineering. But you will also find many tailored functionalities for your daily work with our web platform, such as: clear overviews of your orders, deliveries, invoices and even offers. As a result, you can see your current status anytime, around the clock. Always in real time!
Read further
Market check and sourcing
Is your team running around the clock to master the challenges of daily production? Do you have the time to take care of the latest technology developments and trends? This is exactly the core of your job description for our technicians and engineers. Due to our wide range of suppliers and products, they invest a large part of their time in keeping up to date with the latest technology. While sometimes it's a new interface offered for one specific motor, another time it's a firmware update that unlocks new functionalities that can be leveraged in multiple projects
Read further
Parameterization
Today, hardware and software are two components of a unit that can no longer be separated. As a consequence, it is no longer enough to keep an eye on the physical world. After properly cabling and connecting a component, fine-tuning begins. Only the right settings in the software get the most out of the systems.
Read further