text.skipToContent text.skipToNavigation
 

Stago Defem - The wire tray for demanding conditions


Stago's Defem wire tray system meets the most demanding conditions, such as the heavy chemical industry, offshore or the food industry. Defem is part of the wide product range that cable tray manufacturer Stago carries from the Wibe Group in the Netherlands. The system is quick to assemble, versatile, safe, high quality, strong and economical.


Fast assembly

You are busy, so the system is designed to take very little time to install. In as little as 30 seconds you can make a connection with key 10. In addition, the Defem cable tray system from Stago includes various screwless accessories.


Widely applicable

Special profiles have been developed for the food industry, making Defem suitable for a variety of applications. C, G and Z profiles keep cables protected, accessible and easy to clean (also according to HACCP). Dimensions are available from 30mm to 622mm width and the mini wire tray is available for mounting in the smallest spaces.


Safety first

The system meets the most important safety requirements:

  • E30 and E90 certified fireproof, so function retention of up to 90 minutes at extremely high temperatures according to the DIN 4102-12 guideline.
  • Suitable for equipotential bonding according to IEC 61537, 11:1 and DIN VDE 0100 standards.
  • Tensilock lock bolts and nuts ensure correct force on couplings. 
  • Resistant to vibration according to EN50155 standardization due to self-locking properties.


Solid & high quality

Stago's Defem wire tray is known for its sturdiness and load-bearing capacity. Loads up to 200kg/meter are possible. And the standard thicker wire diameters starting at 5mm makes the wire tray 56.25% stronger than a 4mm wire diameter. Five meters of span is possible without support and the load capacity is the same at every point of the span. Quality is guaranteed by strict quality control at the factory. Moreover, there is no corrosion thanks to gas-free connection in the couplings.


Stago, meters ahead in cable support systems. 


 
 
 
 
 
 
 

Check out our other success stories:

  • TESTIMONIAL
    02.04.2025
    TR Service - Future-proof low-voltage panel
    TR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
    Read more
  • TESTIMONIAL
    19.02.2025
    Peeters - Young Company, New Equipment
    Since its founding a few years ago, Peeters Robotic Solutions has been rapidly developing, working on projects both domestically and internationally and providing standard solutions for industrial palletizing. The company stays up to date with the latest technology, including Festo’s electrical and pneumatic drives. To achieve this, it relies on itsme. “Thanks to their expertise and skills, we can bring innovation to the forefront for our customers.”
    Read more
  • TESTIMONIAL
    26.12.2024
    Kusters - Putting weight behind it
    Kusters was looking for a weighing solution for its banknote devaluation machines that was easy to integrate into the Siemens control system. Through itsme, they came into contact with the right knowledge carriers at Siemens. ‘For us as Kusters, itsme is not only a supplier but also a source of knowledge, with which we co-engineer certain components and process steps, such as this weighing system.’
    Read more
  • TESTIMONIAL
    22.11.2024
    Eneco - Green light for green electricity and steam
    Eneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project began in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”
    Read more

Why not take a look at these trainings we offer: