text.skipToContent text.skipToNavigation
 

Danfoss - Optimize your HVAC with 3D Building Information Modeling files 


Save time and reduce risk 

Design your system faster with access to valuable drive information including 3D Building Information Modeling (BIM) files for VLT® HVAC Drive FC 102. You can fully document your installation in AutoCAD Revit, to reduce the risk of errors, and save time on system design. 

The 3D BIM files of building components enable architects and engineers to create highly accurate visualizations of a final solution. In the design stage, these visualizations help to reduce design iterations and minimize risk. They do this by facilitating checks for adequate space for components, wiring, and piping in a building or ship. 


Transparency from cradle to grave 

In the operational phase, the BIM files also facilitate lifecycle optimization, providing documentation of important component information, from factory to end of life. They enable construction companies to provide adequate documentation in the handover from contractor to owner, for lifetime building maintenance purposes. 

For easier access to data in the form of PDF and Excel files, drawing and product data are split into separate documents. These highly accessible formats make it easier to find required data when ensuring compliance with global standards. It also reduces the 3D file size that the AutoCAD system has to manage and provides the opportunity to comply with the different BIM standards globally. 

You can access all the BIM files for FC 102 drives in the 3D models and drawings library. Use the filter for BIM files for quick access. 

You can also search in MagiCAD Cloud for FC 102 BIM files. 


Your advantages: 

  • Easy integration of FC 102 drives into Building Information Modeling (BIM) systems for lifecycle traceability 

  • Design your system faster with access to important drives information including 3D BIM files. Run fewer design iterations. Easier engineering saves you time and reduces the risk of errors. 

  • BIM information is split into detailed product information and 3D drawing with main drive information. This is done to optimize AutoCAD operation time and 3D storage capacity as well as comply with the different BIM standards globally to add required drive information. 

You might also be interested in this:

  • NEWS
    22.04.2024
    Rittal - VR pedestal
    Delve into the world of the VX plinth plinth system - a successor that takes your cabinet arrangement to the next level. More stability, but also flawless installation. Experience the evolution of your workspace today! Rittal strives to constantly refine and improve its products. As part of this process, the VX plinth plinth system has been redesigned this product has been available since 1 March 2024.
    Read more
  • NEWS
    22.04.2024
    Siemens - SINAMICS G220 variable speed drive now also in IP55
    In addition to the previously released IP20 variant of the SINAMICS G220 variable speed drive, the IP55 version of this innovative drive is now also available. This version comes standard with coated circuit boards that make the inverter resistant even outside the control cabinet to aggressive influences in a harsh industrial environment. As an option, a housing-mounted isolating switch can also be supplied to ensure safe disconnection of voltage without any other external components.
    Read more
  • NEWS
    15.04.2024
    Fluke - 87-V digital multimeter
    Technological advances now allow accurate electrical measurements to be taken during installation and maintenance using a digital multimeter (DMM), allowing technicians to diagnose problems that lead to premature failure.
    Read more
  • NEWS
    15.04.2024
    Schneider Electric - PanelSeT SFN replaces Spacial SF floor-standing enclosures
    The new generation of PanelSeT SFN floor-standing enclosures is the successor and updated version of the successful Spacial SF series. In the coming months, the floor-standing enclosures from the Spacial SF series will continue to be available but these will eventually be replaced in their entirety by the updated PanelSeT SFN series.
    Read more
  • TESTIMONIAL
    19.04.2024
    Dymotec - Open Lines in a ‘Perfect Storm’
    COVID-19 and global component scarcity threw the industry into a ‘perfect storm’. Industrial automator Dymotec and Breemes kept the phone lines constantly open to tackle the scarcity problem together with creativity and proactivity. Dymotec in Olen (B) focuses on industrial automation spanning a broad spectrum of industries, from food and pharma to logistics and metal. The company has been around for 30 years and joined the Jeco Energies Group in 2022. Dymotec now has some 50 employees and also has a flexible shell with technicians, programmers and project engineers. Ever since its establishment, the company from Kempen has had a relationship with (the predecessors of) Breemes.
    Read more
  • TESTIMONIAL
    15.02.2024
    Enduro - Complete package for heavy-duty work
    Enduro Softslings builds machines for the manufacture of its own heavy lifting soft slings. For a new machine, it called in itsme for the full package: advice on the drives, supply of components and programming of the controls. “We completed the entire project in just over six months. That’s fast for such a specialised machine.”
    Read more
  • TESTIMONIAL
    20.12.2023
    Innovatec - Hatching Better Procurement
    Innovatec Hatchery Automation launched a process of professionalisation for its procurement process last year. The company partnered with itsme because of its technical expertise, logistics concepts and intensive contacts with manufacturers. “First we were dating, but now we’re thinking about moving in together.”
    Read more
  • TESTIMONIAL
    13.12.2023
    Elektro Internationaal - Unburdening with Vendor Managed Inventory
    Optimising internal logistics is often a challenge for panel builders, from grab stock management to getting a grip on delivery times. Especially when production is spread across multiple sites, like at Elektro Internationaal (EI) in Woerden. In 2016, the company already took a big step, together with itsme Connected Business, at their batch production site. This was related to the introduction of Vendor Managed Inventory (VMI) in the form of a 2BIN system. In the near future, EI expects to start the construction of new premises, whereby all activities will be brought under one roof. At that point, the logistics for the entire production will also be optimised.
    Read more