text.skipToContent text.skipToNavigation
 

Danfoss - Optimize your HVAC with 3D Building Information Modeling files 


Save time and reduce risk 

Design your system faster with access to valuable drive information including 3D Building Information Modeling (BIM) files for VLT® HVAC Drive FC 102. You can fully document your installation in AutoCAD Revit, to reduce the risk of errors, and save time on system design. 

The 3D BIM files of building components enable architects and engineers to create highly accurate visualizations of a final solution. In the design stage, these visualizations help to reduce design iterations and minimize risk. They do this by facilitating checks for adequate space for components, wiring, and piping in a building or ship. 


Transparency from cradle to grave 

In the operational phase, the BIM files also facilitate lifecycle optimization, providing documentation of important component information, from factory to end of life. They enable construction companies to provide adequate documentation in the handover from contractor to owner, for lifetime building maintenance purposes. 

For easier access to data in the form of PDF and Excel files, drawing and product data are split into separate documents. These highly accessible formats make it easier to find required data when ensuring compliance with global standards. It also reduces the 3D file size that the AutoCAD system has to manage and provides the opportunity to comply with the different BIM standards globally. 

You can access all the BIM files for FC 102 drives in the 3D models and drawings library. Use the filter for BIM files for quick access. 

You can also search in MagiCAD Cloud for FC 102 BIM files. 


Your advantages: 

  • Easy integration of FC 102 drives into Building Information Modeling (BIM) systems for lifecycle traceability 

  • Design your system faster with access to important drives information including 3D BIM files. Run fewer design iterations. Easier engineering saves you time and reduces the risk of errors. 

  • BIM information is split into detailed product information and 3D drawing with main drive information. This is done to optimize AutoCAD operation time and 3D storage capacity as well as comply with the different BIM standards globally to add required drive information. 

You might also be interested in this:

  • NEWS
    15.11.2024
    Leuze - To the “PIN” point!
    If you’re looking for solutions for a wide range of applications, Leuze is the right place for you. Whether it’s high precision or extreme environmental conditions like cleaning processes, deep-freeze environments, or high-speed switching sensors—Leuze always offers a fitting solution.
    Read more
  • NEWS
    13.11.2024
    Danfoss - Programming the iC2-Micro
    iC2-Micro is available with a high-speed adapter for PC programming even without mains power. This AC drive has Smart Logic Controller (SLC) for easy customization and is UL LZGH2/8 certified for use in systems with A2L refrigerants.
    Read more
  • NEWS
    08.11.2024
    ABB - Auxiliary contacts for AF contactors
    With the AF range of contactors, ABB offers a complete range of accessories, thermal or electronic overload relays and connection accessories. New to the range is the 2-pole auxiliary contact for front mounting that is specially designed for AF switches up to 100 A.
    Read more
  • NEWS
    08.11.2024
    Schneider Electric - TeSys island
    Schneider Electric's TeSys island is the next generation of motor control and power management, designed to make machines and equipment more intelligent, proactive, and diagnostic-ready. By integrating TeSys island into control panels, panel builders can save valuable time and resources, enabling them to deliver equipment faster, at lower cost, and with enhanced functionality.
    Read more
  • TESTIMONIAL
    08.11.2024
    Xeltis - Heart for business
    Xeltis develops technology for making artificial vessels and heart valves. When they needed a professional measuring machine for quality control, they knocked on itsme's door for control software and data collection. It worked out really well. “itsme has a lot of in-house expertise, they know everything about the hardware and they can switch quickly with partners. Plus, they're flexible.”
    Read more
  • TESTIMONIAL
    08.11.2024
    Van de Kar - Greater efficiency and depth with bespoke training
    Van de Kar Elektrotechniek has had a relationship with itsme since early 2003 for the supply of materials and Siemens training sessions. This spring was the premiere of in-house customised training. “That is much more efficient. Our guys already have a certain background, so they can skip basic stuff and actually dive deeper into specific parts.”
    Read more
  • TESTIMONIAL
    08.11.2024
    Manders Automation - Challenging each other to do it better and smarter
    The relationship between Manders Automation and itsme is all about flexibility and the drive to do things better and smarter. Take, for example, the 2BIN system for grab stock management and the complete kits for serial machine construction. “We are constantly challenging each other. We also want to take additional steps in digitalization and become more sustainable.”
    Read more
  • TESTIMONIAL
    08.11.2024
    Matco International - Secure cooperation
    Matco International has enjoyed a relationship with itsme for almost 20 years for the supply of electrical components, including safety sensors and systems from Leuze. “In our cooperation with the itsme-Leuze combination, reliability is very important, not just in terms of quality, but also of availability”, says André van der Wei, director and owner of Matco. “The orders always go through itsme, but sometimes we also call on Leuze's expertise directly.”
    Read more